A. Materials
- Slope
- Emory pole
- Notebook
B. Methods
- Put one side of the Emory pole on the ground and make sure its straight up.
- Have your partner put the pole straight away from you.
- Put the other pole as far as you can away from the other so the rope is taunt.
- Look at the horizon and line up it with the top of the farthest pole top.
- Once there lined up look at the pole closest to you and measure where the horizon and the pole top line up.
- Then write the measurements down in your notebook.
-Sam
No comments:
Post a Comment